The new Terminal B is a terminal / concourse facility connected to, and immediately south of, the in-progress North Concourse project. Terminal B is a two-level facility, with an approximate ground level footprint of 150’ x 510’ which overlaps the North Concourse (which is currently under construction by another contractor) by approximately 270 feet. This overlap will require a great deal of coordination with the North
Concourse construction sequence. Terminal B is intended to provide ticket, baggage claim and security functions for the North Concourse and future terminal additions. The ground level will be taken up in its entirety by ticketing and baggage claim facilities and associated support functions, primarily airline ticket office space.

The western portion of the second level will comprise a continuation of the concourse and hold rooms in the pattern of the North Concourse. The eastern portion of the second level
will include a set of restrooms identical to those in the North Concourse, concessions space, and a large security checkpoint area. Most mechanical and some electrical equipment will be housed on a largely exterior, but screened, mezzanine above the mid section of the terminal, again matching the North Concourse layout. Additionally many of the mechanical and electrical systems in Terminal B are expected to be fed from the existing central plant located between the northern end of the north concourse and the
international terminal adjacent to terminal A. Some Information Technology-type systems such as fire alarm and the Building Management System (BMS) will require extension from the North Concourse. An automated, in line baggage screening system will be included as part of this project, with installation of the majority of the system in the basement of the North Concourse building.
|
Bid Package #1 - Structure
|
|
Bid Package #1's scope encompasses the work
necessary to complete the superstructure. Listed below are the subsystems that were bid and significant dates in the process:
1A Structural Steel
1B Metal Decking
Package Release Date >> July 20, 2007
Pre-Proposal Conference >> August 7, 2007
Bid Package #1 Documents >> No Longer Available
Bids Received >> September 7, 2007 at 2:00 PM (PDT)
Bid Results >> Available For Review
|
Bid Package #2 - Major Trades
|
|
Bid Package #2's scope encompasses the work necessary to complete the exterior envelope and basic building structure to facilitate the installation of finishes. Listed below are the subsystems that were bid and significant dates in the process:
2A Earthwork and Grading
2B Concrete Material
2C Concrete Reinforcement
2D Metal Fabrications
2E Cementitious Fireproofing
2F Elevators & Escalators
Package Release Date >> October 31, 2007
Bid Package #2 Documents >> No Longer Available
Bid Received for Subsystem 2B thru 2F >> November 29, 2007 at 2:00 PM (PST)
Bid Received for Subsystem 2A >> December 6, 2007 at 2:00 PM (PST)
Bid Results >> Available For Review
|
Bid Package #3 - Interior & Exterior Finishes
|
|
Bid Package #3's scope encompasses the work necessary to complete the projects architectural finishes and accessories. Listed below are the subsystems that were bid and significant dates in the process:
3A Apron Paving
3B Ground & Polished Concrete
3C Ornamental Metal / Glass Railing
3D Metal Panels
3E Tile
3F Epoxy & Precast Terrazzo
3G Resilient Flooring & Carpet
3H Painting & Wall Coverings
3I Window / Roller Shades
Package Release Date >> April 15,2008
Pre-qualification Statement >> Required by April 29, 2008
Pre-Proposal Conference >> April 29, 2008 at 10:00 AM (PDT)
Bid Package #3 Specific Documents >> No Longer Available
Bids Received >> May 29, 2008 at 2:00 PM (PDT)
Bid Results >> Partial Listing Available For Review
|
Bid Package #4 - Interior & Exterior General Construction
|
|
Bid Package #4's scope encompasses the work necessary to complete the projects architectural finishes and accessories. Listed below are the subsystems that were bid and significant dates in the process:
4A Building Insulation & Firestopping
4B Sloped Skylight Systems
4C Drywall, Plaster & Related
4D Acoustic Ceilings
4E Specialty Ceilings
4F Solid Phenolic Wall Panels
4G Building Specialties:
I - Solid Composite Toilet Compartments
II - Fire Protection Specialties
III - Safety Specialties
IV - Toilet Accessories and Mirrors
V - Postal Specialties
VI - Floor Mats and Frames
Package Release Date >> May 27, 2008
Pre-qualification Statement >> Required Prior to Bid
Pre-Proposal Conference >> June 4, 2008 at 10:00 AM (PDT)
Deadline for Questions (FRBI) >> June 12, 2008 at 4:00 PM (PDT)
Bid Package #4 Specific Documents >> No Longer Available
Bids Received for Subsystems 4A, 4C, 4D, 4E, 4F & 4G >> June 26, 2008 at 2:00 PM (PDT)
Bids Received for Subsystem 4B >> July 3, 2008 at 2:00 PM (PDT)
Bid Results >> Partial Listing Available For Review
|
Bid Package #5 - Roof Construction and Doors, Frames & Hardware
|
|
Bid Package #5's scope encompasses the work necessary to complete the projects architectural finishes and accessories. The subsystems are as follows:
5A Single Ply Membrane Roofing
5B Flashing and Sheet Metal
5C Steel Doors & Frames and Door Hardware
Package Release Date >> July 30, 2008
Pre-qualification Statement >> Required Prior to Bid
Pre-Proposal Conference >> August 12, 2008 at 10:00 AM (PDT)
Deadline for Questions (FRBI) >> August 21, 2008 at 4:00 PM (PDT)
Bid Package #5 Specific Documents >> No Longer Available
Bids Received >> August 28, 2008 at 2:00 PM (PDT)
Bid Results >> Partial Listing Available For Review
|
Drawings and Specifications
|
|
Please refer to the Drawings and Specs page for information on obtaining drawings and specifications for any of the bid packages. Narratives for all Addenda related to New Terminal B packages will be posted the day of issue at the New Terminal B Bid Documents
page and drawings will available the same day from the printing vendor.
All inquires related to the New Terminal B bid process should be directed to tb1@sjctaip-opportunities.com.
|