The Consolidated Rental Car Garage (ConRAC) element represents the single largest piece of the Terminal Area Improvement Program. This new state-of-the art facility
consists of a seven story precast garage structure and an adjacent four story
precast quick turn around facility with related fueling, car wash and light maintenance
equipment. Access to the main garage structure is
provided by means of two seven story cast-in-place concrete spiral helix ramps.
To provide convenient short term parking for travelers, the first floor is dedicated to public
parking and includes a parking control systems. Also located on the first floor is the Customer Service Building
for the on-airport rental car pick-up and return.
This portion of the facility has standard finishes including polished concrete,
carpet, custom millwork, automatic glass entrance doors, metal ceiling systems,
interior partitions, customer restrooms and two banks of elevators that service
the ready / return levels of the facility. Floors two through seven have customer restrooms and designated
areas for rental company service kiosks.
|
Bid Package #1 - Foundations & Superstructure
|
|
The subsystem scopes of work for Bid Package #1 are comprised of the general construction elements needed to complete the foundation and superstructure portion of the ConRAC element. Listed below are the subsystems that were bid and significant dates in the process:
1A Site Preparation
1B Lime Treatment
1C Site Grading
1D Deep Foundations Piles
1E Concrete Reinforcing
1F Concrete Form, Place and Finish
1G Concrete Material
1H Structural Precast Concrete
Package Release Date >> October 9, 2007
Pre-Proposal Conference >> October 23, 2007 at 2:00 PM (PST)
Bid Package #1 Documents >> No Longer Available
Bids Received for Subsystems 1A, 1B, 1C, 1D, 1G & 1H >> November 13, 2007 at 2:00 PM (PST)
Bids Received for Subsystems 1E & 1F >> November 20, 2007 at 2:00 PM (PST)
Bid Results >> Available For Review
|
Bid Package #2 - Metal Stairs, Elevators, Mechanical & Plumbing
|
|
The subsystem scopes of work for Bid Package #2 have been selected because of the long lead time nature of their materials and equipment and thus their impact on the overall construction schedule. Listed below are the subsystems that were bid and significant dates in the process:
2.01 Metal Stairs & Railing
2.02 Traction Elevators
2.03 Mechanical & Plumbing
Package Release Date >> March 10, 2008
Pre-qualification Statement >> Required by March 31, 2008
Pre-Proposal Conference >> March 26, 2008 at 2:00 PM (PDT)
Deadline for Questions (RFBI) >> April 7, 2008 at 4:00 PM (PDT)
Bid Package #2 Documents >> No Longer Available
Bids Received for Subsystems 2.01 & 2.02 >> April 15, 2008 at 2:00 PM (PDT)
Bids Received for Subsystem 2.03 >> April 17, 2008 at 2:00 PM (PDT)
Bid Results >> Available For Review
|
Bid Package #3 - Misc. Structural & Special Systems
|
|
The subsystem scopes of work for Bid Package #3 are comprised of miscellaneous structural work and special systems related to the processing of returned rental cars to the ConRAC facility. Listed below are the subsystems that were bid and significant dates in the process:
3.01 Masonry
3.02 Misc. Steel & Metal Deck
3.03 Central Vacuum System
3.04 Vehicle Wash Systems
3.05 Vehicle Fueling System
Package Release Date >> June 10, 2008
Pre-Proposal Conference >> June 17, 2008 at 2:00 PM (PDT)
Pre-qualification Statement >> Must be submitted by June 27, 2008
Deadline for Questions (RFBI) >> July 8, 2008 at 4:00 PM (PDT)
Bid Package #3 Specific Documents >> No Longer Available
Bids Received >> July 17, 2008 at 2:00 PM (PDT)
Bid Results >> Available For Review
|
Bid Package #4 - General Construction
|
|
The subsystem scopes of work for Bid Package #4 are comprised of the general construction activities needed to complete the facility envelope and finishes and to provide certain special equipment to complete the ConRAC element. Documents will be available per the dates listed below and the subsystems scopes of work are as follows:
4.01 Wire Mesh Facade
4.02 Expansion Control
4.03 Architectural Woodwork
4.04 Sealants & Fire Stopping
4.05 Glass & Glazing Systems
4.06 Drywall Systems
4.07 Tile
4.08 Terrazzo Flooring
4.09 Acoustical Systems
4.10 Paintings & Wall Coverings
4.11 Interior & Exterior Signage
4.12 Floor Security Equipment
4.13 Waterproofing & Sealers
Package Release Date >> October 7, 2008
Pre-Proposal Conference >> October 21, 2008
Bid Package #4 Specific Documents >> Available October 7, 2008
Bid Date for All Subsystems but 4.02 >> November 13, 2008
Bid Date for Subsystem 4.02 >> November 18, 2008 
|
Other Documents
|
|
Please refer to the Drawings and Specs page for information on obtaining drawings and specifications for any of the bid packages. Narratives for all Addenda related to ConRAC packages will be posted the day of issue at the ConRAC Bid Documents page and drawings will be available the same day from the printing vendor.
All inquires related to the ConRAC bid process should be directed to rpg@sjctaip-opportunities.com.
|