UpdatesElementsBid DocsBid Results

 


ConRAC Garage

    Home > Elements > ConRAC Garage


Search:
  

The Consolidated Rental Car Garage (ConRAC) element represents the single largest piece of the Terminal Area Improvement Program.  This new state-of-the art facility consists of a seven story precast garage structure and an adjacent four story precast quick turn around facility with related fueling, car wash and light maintenance equipment.  Access to the main garage structure is provided by means of two seven story cast-in-place concrete spiral helix ramps.   To provide convenient short term parking for travelers, the first floor is dedicated to public parking and includes a parking control systems.  Also located on the first floor is the Customer Service Building for the on-airport rental car pick-up and return.   This portion of the facility has standard finishes including polished concrete, carpet, custom millwork, automatic glass entrance doors, metal ceiling systems, interior partitions, customer restrooms and two banks of elevators that service the ready / return levels of the facility. Floors two through seven have customer restrooms and designated areas for rental company service kiosks.

Bid Package #1 - Foundations & Superstructure

The subsystem scopes of work for Bid Package #1 are comprised of the general construction elements needed to complete the foundation and superstructure portion of the ConRAC element.  Listed below are the subsystems that were bid and significant dates in the process:

1A   Site Preparation

1B   Lime Treatment

1C   Site Grading

1D   Deep Foundations Piles

1E   Concrete Reinforcing

1F   Concrete Form, Place and Finish

1G   Concrete Material

1H   Structural Precast Concrete

 

Package Release Date >> October 9, 2007

Pre-Proposal Conference >> October 23, 2007 at 2:00 PM (PST)

Bid Package #1 Documents >> No Longer Available

Bids Received for Subsystems 1A, 1B, 1C, 1D, 1G & 1H >> November 13, 2007 at 2:00 PM (PST)

Bids Received for Subsystems 1E & 1F >> November 20, 2007 at 2:00 PM (PST)

Bid Results >> Available For Review

Bid Package #2 - Metal Stairs, Elevators, Mechanical & Plumbing

The subsystem scopes of work for Bid Package #2 have been selected because of the long lead time nature of their materials and equipment and thus their impact on the overall construction schedule.  Listed below are the subsystems that were bid and significant dates in the process:

2.01   Metal Stairs & Railing

2.02   Traction Elevators

2.03   Mechanical & Plumbing

 

Package Release Date >> March 10, 2008

Pre-qualification Statement >> Required by March 31, 2008

Pre-Proposal Conference >> March 26, 2008 at 2:00 PM (PDT)

Deadline for Questions (RFBI) >> April 7, 2008 at 4:00 PM (PDT)

Bid Package #2 Documents >> No Longer Available

Bids Received for Subsystems 2.01 & 2.02 >> April 15, 2008 at 2:00 PM (PDT)

Bids Received for Subsystem 2.03 >> April 17, 2008 at 2:00 PM (PDT)

Bid Results >> Available For Review

Bid Package #3 - Misc. Structural & Special Systems  

The subsystem scopes of work for Bid Package #3 are comprised of miscellaneous structural work and special systems related to the processing of returned rental cars to the ConRAC facility.  Listed below are the subsystems that were bid and significant dates in the process:

3.01   Masonry

3.02   Misc. Steel & Metal Deck

3.03   Central Vacuum System

3.04   Vehicle Wash Systems

3.05   Vehicle Fueling System

 

Package Release Date >> June 10, 2008

Pre-Proposal Conference >> June 17, 2008 at 2:00 PM (PDT)

Pre-qualification Statement >> Must be submitted by June 27, 2008

Deadline for Questions (RFBI) >> July 8, 2008 at 4:00 PM (PDT)

Bid Package #3 Specific Documents >> No Longer Available

Bids Received >> July 17, 2008 at 2:00 PM (PDT)

Bid Results >> Available For Review

Bid Package #4 - General Construction

The subsystem scopes of work for Bid Package #4 are comprised of the general construction activities needed to complete the facility envelope and finishes and to provide certain special equipment to complete the ConRAC element.  Documents will be available per the dates listed below and the subsystems scopes of work are as follows:

4.01   Wire Mesh Facade

4.02   Expansion Control

4.03   Architectural Woodwork

4.04   Sealants & Fire Stopping

4.05   Glass & Glazing Systems

4.06   Drywall Systems

4.07   Tile

4.08   Terrazzo Flooring

4.09   Acoustical Systems

4.10   Paintings & Wall Coverings

4.11   Interior & Exterior Signage

4.12   Floor Security Equipment

4.13   Waterproofing & Sealers

 

Package Release Date >> October 7, 2008

Pre-qualification Statement >> October 31, 2008

Pre-Proposal Conference >> October 21, 2008

General Bid Documents >> Available for Downloading

Bid Package #4 Specific  Documents >> Available October 7, 2008

Bid Date for All Subsystems but 4.02 >> November 13, 2008

Bid Date for Subsystem 4.02 >> November 18, 2008  

Other Documents

Please refer to the Drawings and Specs page for information on obtaining drawings and specifications for any of the bid packages.  Narratives for all Addenda related to ConRAC packages will be posted the day of issue at the ConRAC Bid Documents page and drawings will be available the same day from the printing vendor.

All inquires related to the ConRAC bid process should be directed to rpg@sjctaip-opportunities.com.



Updates I Elements I Bid Docs I Bid Results
Home I Inquiries I Terms & Conditions

© 2007-2008 Hensel Phelps Construction Co. All rights reserved.