Bid Package #1 - EDS Screening Building

Bid proposals for Bid Package #1 were received by Hensel Phelps on June 21, 2007 and after performing a review of the proposals, the following are the results:

1A  Roofing

 

1 - Alliance Roofing

 

2 - Legacy Roofing

1B  Drywall, Insulation, Sheathing, Hollow Metal Doors & Frames, Metal Sliding Doors and       Hardware

 

1 - Insul Acoustics

 

2 - Allen Specialties

 

3 - J & J Acoustics

Bid Package #2 -

Escalators and Service Elevator
Emergency Exit Stairs and Material Receiving Area

Bid proposals for Bid Package #2.1 were received by Hensel Phelps on August 15, 2007 and after performing a review of the proposals, the following are the results:

2.1A  Elevators & Escalators

 

1 - Schindler Elevator Corporation

 

2 - ThyssenKrupp Elevator


Bid proposals for Bid Package #2.2 were received by Hensel Phelps on August 21, 2007 and after performing a review of the proposals, the following are the results:

2.2A   Building and Selective Demolition

 

1 - Joseph J. Albanese, Inc.

 

2 - Roldan Construction

2.2B  Form, Place, and Finish Cast-In-Place Concrete

 

1 - Joseph J. Albanese, Inc.

2.2C  Concrete & CMU Reinforcing

 

(N/A - Included in Subsystems 2.2B and 2.2D)

2.2D  CMU

 

1 - Dixon / Spencer Masonry, A Joint Venture

 

2 - Bratton Masonry, Inc.

2.2E  Misc. Metals & Ornamental Metals

 

1 - Gilmore Steel, Inc.

2.2F  Chain Link Fencing & Gates

 

1 - Oliveira Fence Incorporated

 

2 - North American Fence Co/Supply

2.2G  Waterproofing & Joint Sealants

 

1 - Alliance Roofing

 

2 - F.D. Thomas, Inc.

Bid Package #3 - Superstructure and Foundations for Ticket Lobbies & Airside Expansion

Bid proposals for Bid Package #3 were received by Hensel Phelps on November 6, 2007 and after performing a review of the proposals, the following are the results:

3A  Structural Steel & Miscellaneous Metals

 

1 - Olson & Co Steel

 

2 - Westco Iron Works

 

3 - Metal Works

3B  Metal Decking

 

1 - Pacific Erectors, Inc.

 

2 - Anning-Johnson Company

 

3 - B.T. Mancini Co., Inc.

3C  Concrete Materials

 

1 - CEMEX

 

2 - Central Concrete Supply Co., Inc.

 

3 - Graniterock

3D  Concrete Reinforcing

 

1 - Pacific Coast Steel

 

2 - Regional Steel Corporation

3E  Fireproofing

 

1 - Anning-Johnson Company

 

2 - F. Rodgers Corporation

 

3 - LVI Environmental Services, Inc.

Bid Package #4 - EDS Screening Building Baggage Handling System

Bid proposals for Bid Package #4 were received by Hensel Phelps on November 6, 2007 and after performing a review of the proposals, the following are the results.  Unfortunately a contract was not awarded as the baggage handling system work was ultimately eliminated from the scope of the EDS screening building project:

4A  Baggage Handling System

 

1 - The Horsley Co.

Bid Package #5 - Interior & Exterior Assemblies

Bid proposals for Bid Package #5 were received by Hensel Phelps on May 13, 2008 and after performing a review of the proposals, the following are the results:

5A  Selective Building Interior Demolition

 

1 - Joseph J. Albanese, Inc.

 

2 - Roldan Construction, Inc.

 

3 - Stomper Co., Inc.

 

4 - Midwest Demolition of California

 

5 - LVI Environmental Services, Inc.

 

6 - Evans Brothers, Inc.

5B  Expansion Joint Covers

 

1 - B.T. Mancini Co., Inc.

 

2 - Expansion Specialties, Inc.

 

3 - CM & B dba Mauck Sheet Metal

 

4 - Valley Sheet Metal Co.

5C  Building Insulation

 

1 - F. Rodgers Corporation

 

2 - Alcal-Arcade Contracting, Inc.

5D  Roofing

 

1 - Andy’s Roofing Company, Inc.

 

2 - Reinhardt Roofing, Inc.

 

3 - F. Rodgers Corporation

 

4 - Alliance Roofing Company, Inc.

 

5 - Alcal-Arcade Contracting, Inc.

 

6 - Roofing Constructors, Inc.

 

7 - Best Contracting Services, Inc.

5E  Flashing and Sheet Metal

 

1 - WKW Mechanical Contractors, Inc.

 

2 - CM & B dba Mauck Sheet Metal

 

3 - Omni Sheet Metal, Inc.

5F  Hollow Metal Doors, Frames and Hardware

 

1 - Jones Materials, Inc.

 

2 - Security Metal Products Corp.

 

3 - PCI Doors

5G  Drywall, Metal Stud Framing and Related

 

1 - J & J Acoustics

 

2 - Insul Acoustics North Inc.

 

3 - Performance Contracting, Inc.

 

4 - Daley’s Drywall & Taping

5H  Portland Cement Plaster

 

(Awarded with Subsystem 5G  Drywall, Metal Stud Framing and Related)

5I  Acoustical Ceilings

 

1 - Acoustech, Inc.

 

2 - T3, Inc.

 

3 - San Francisco Interiors, Inc.

 

4 - George Family Enerpirses, Inc.

5J  Specialty Ceilings

 

(Awarded with Subsystem 5I  Acoustical Ceilings)

Bid Package #6 - Interior Finishes

Bid proposals for Bid Package #6 were received by Hensel Phelps on May 22, 2008 and after performing a review of the proposals, the following are the results:

6A  Polished Concrete

 

(Not awarded due to elimination of polished concrete scope of work)

6B  Column Covers, Stainless Steel Base, Stainless Steel Wainscot & Rolling Security Screens

 

(Not awarded)

6C  Glass Railings

 

1 - Columbia Fabricating Co.

 

2 - Environmental Interiors, Inc.

6D  Terrazzo Flooring

 

1 - Corradini Corporation

 

2 - Associated Terrazzo Co., Inc.

 

3 - Marbella Flooring, Inc.

6E  Carpet & VCT Flooring

 

1 - MCC Flooring Contractors, Inc.

 

2 - B.T. Mancini Co., Inc.

 

3 - Hye Quality Floors Interiors

6F  Paints & Coatings

 

1 - C & C Painting & Decorating

 

2 - A & B Painting, Inc.

 

3 - Walters & Atlantis Painting

 

4 - George E. Masker, Inc.

 

5 - Jerry Thompson & Sons, Inc.

Bid Package #7 - Consolidated Woodwork and Signage

Bid Package #7 has been released for bidding, but bids have not been received by Hensel Phelps, therefore there are no results to review at this time.