UpdatesElementsBid DocsBid Results

 


Terminal A Mods

    Home > Bid Docs > Terminal A Mods


Search:
  

Bid Package #1 - EDS Screening Building

The bid period for Bid Package #1 ended with the receipt of proposals on June 21, 2007 therefore bid documents for this package are no longer available.  Should any of the document associated with Bid Package #1 be required post bid, please make a formal request to tam@sjctaip-opportunities.com.
 

Bid Package #2 -

Escalators and Service Elevator
Emergency Exit Stairs and Material Receiving Area

The bid period for Bid Package #2 has ended with the receipt of proposals on August 15, 2007 for the #2.1 subsystem and on August 21, 2007 for #2.2 subsystems; therefore bid documents for this package are no longer available.  Should any of the document associated with Bid Package #2 be required post bid, please make a formal request to tam@sjctaip-opportunities.com.
 

Bid Package #3 - Superstructure and Foundations for Ticket Lobbies & Airside Expansion

The bid period for Bid Package #3 ended with the receipt of proposals on November 8, 2007 therefore bid documents for this package are no longer available.  Should any of the document associated with Bid Package #3 be required post bid, please make a formal request to tam@sjctaip-opportunities.com.
 

Bid Package #4 - EDS Screening Building Baggage Handling System

The bid period for Bid Package #4 ended with the receipt of proposals on November 6, 2007 therefore bid documents for this package are no longer available.  Should any of the document associated with Bid Package #4 be required post bid, please make a formal request to tam@sjctaip-opportunities.com.
 

Bid Package #5 - Interior & Exterior Assemblies

The bid period for Bid Package #5 ended with the receipt of proposals on May 13, 2008 therefore bid documents for this package are no longer available.  Should any of the document associated with Bid Package #5 be required post bid, please make a formal request to tam@sjctaip-opportunities.com.
 

Bid Package #6 - Interior Finishes

The bid period for Bid Package #6 ended with the receipt of proposals on May 22, 2008 therefore bid documents for this package are no longer available.  Should any of the document associated with Bid Package #6 be required post bid, please make a formal request to tam@sjctaip-opportunities.com.
 

Bid Package #7 - Consolidated Woodwork and Signage

Below are Bid Package #7 specific documents that are available for immediate downloading and review.  Throughout the bid process additional documents will be posted below for downloading and review as necessary.  Bidders should also review the general bid documents that are associated with all bid packages and subcontracts.  Bidders should note that drawings for Bid Package #7 are not available at this time for downloading due to the size of the electronic files, but can be purchased by making the proper arrangements to obtain drawing and specification access.
 

 Consolidated Woodwork and Signage Bid Package #7 Addendum #3 dated 09/25/08  (49 KB)  

 Consolidated Woodwork and Signage Bid Package #7 Addendum #2 dated 09/09/08  (21 KB)

 Consolidated Woodwork and Signage Bid Package #7 Addendum #2 A Specs dated 09/05/08  (4.0 MB)

 Consolidated Woodwork and Signage Bid Package #7 Addendum #2 B Specs dated 09/05/08  (5.1 MB)

 Consolidated Woodwork and Signage Bid Package #7 Addendum #2 A Drawings dated 09/03/08  (59.0 MB)

 Consolidated Woodwork and Signage Bid Package #7 Addendum #2 B Drawings dated 09/03/08  (65.2 MB)

 Consolidated Woodwork and Signage Bid Package #7 Addendum #1 dated 08/22/08  (3.32 MB)

 Consolidated Woodwork and Signage Bid Package #7 Instructions to Bidders dated 07/31/08  (275 KB)



Updates l Elements l Bid Docs l Bid Results
Home I Inquiries I Terms & Conditions

© 2007-2008 Hensel Phelps Construction Co. All rights reserved.