UpdatesElementsBid DocsBid Results

 


ConRAC Garage

    Home > Bid Docs > ConRAC Garage


Search:
  

Bid Package #1 - Foundations & Superstructure

The bid period for Bid Package #1 ended with the receipt of proposals on November 13, 2007 and November 20, 2007; therefore bid documents for this package are no longer available.  Should any of the documents associated with Bid Package #1 be required post bid, please make a formal request to rpg@sjctaip-opportunities.com.

Bid Package #2 - Metal Stairs, Elevators, Mechanical & Plumbing

The bid period for Bid Package #2 ended with the receipt of proposals on April  15, 2008 for Subsystems 2.01 and 2.02 and April 17, 2007 for Subsystem 2.03; therefore bid documents for this package are no longer available.  Should any of the documents associated with Bid Package #2 be required post bid, please make a formal request to rpg@sjctaip-opportunities.com.

Bid Package #3 - Misc. Structural & Special Systems

The bid period for Bid Package #3 ended with the receipt of proposals on July 17, 2008; therefore bid documents for this package are no longer available.  Should any of the documents associated with Bid Package #3 be required post bid, please make a formal request to rpg@sjctaip-opportunities.com.

Bid Package #4 - Finishes

Below are Bid Package #4 specific documents that are available for immediate downloading and review.  Throughout the bid process additional documents will be posted below for downloading and review as necessary.  Bidders should also review the general bid documents that are associated with all bid packages and subcontracts.  Bidders should note that drawings for Bid Package #3 are not available at this time for downloading due to the size of the electronic files, but can be purchased by making the proper arrangements to obtain drawing and specification access.

 

 ConRAC Bid Package #4 Addendum #3 dated November 6, 2008  (338 KB)  

 ConRAC Bid Package #4 Addendum #2 dated November 5, 2008  (3.36 MB)  

 ConRAC Bid Package #4 Addendum #1 dated October 24, 2008  (31 KB)

 Attachment #1 - Instructions To Bidders Revisions  (180 KB)

 Attachment #2 - Permit Bulletin #1 Plans - Vol. 1 dated October 24, 2008  (36.6 MB)

 Attachment #3 - Permit Bulletin #1 Plans - Vol. 2 dated October 24, 2008  (69.2 MB)

 Attachment #4 - Permit Bulletin #1 Plans - Vol. 3 dated October 24, 2008  (19.9 MB)

 Attachment #5 - Permit Bulletin #1 Plans - Vol. 4 dated October 24, 2008  (16.1 MB)

 Attachment #6 - Specifications Section 02764 - Parking Appurtenances dated October 24, 2008  (36 KB)

 Attachment #7 - Specifications Section 07141 - Waterproofing and Traffic dated October 24, 2008  (67 KB)

 Attachment #8 - Specifications Section 09260 - Gypsum Board Assemblies dated October 24, 2008  (96 KB)

 Attachment #9 - Specification Section 11150 - Physical Security Equipment dated October 24, 2008  (69 KB)

 Attachment #10 - Specification Section 13046 - Parking control Booths dated October 24, 2008  (35 KB)

 ConRAC Bid Package #4 Instructions to Bidders dated October 7, 2008  (1.13 MB)

Reference Documents:

 HP ConRAC Specific Subcontract dated 09.25.08  (293 KB)


 


Updates l Elements l Bid Docs l Bid Results
Home I Inquiries I Terms & Conditions

© 2007-2008 Hensel Phelps Construction Co. All rights reserved.

© 2007-2008 Hensel Phelps Construction Co. All rights reserved.